Pre-Sale VendorUrgency: Acute · listing in 60-120 days
Trigger: Pre-sale building report shows termite damage

The pre-sale report has damage on it. You list in 4 months. The buyers will see it.

You want your asking price. Smart vendors fix the structural problem before listing, document it to insurance grade, and hand the documentation to every inspector who walks the house. We do exactly that, on the timeline your agent gave you.

What you're thinking right now

Some of these will be familiar.

  • "If I don't fix it, every buyer's inspector will find it and use it against me."
  • "If I fix it badly, the documentation will hurt me more than the original problem."
  • "My agent says list in March. Can you finish before then?"
  • "How do I prove to a buyer's solicitor that the repair was done properly?"
  • "I don't want to discount $60K when a $20K repair would close the objection."
What you actually need
  • A locked completion date — before your listing photographer arrives
  • Insurance-grade documentation pack — every buyer's solicitor accepts it
  • A 25-year transferable structural guarantee — the next owner inherits the protection
  • "Repaired by YBMT · Structural Engineer Co-Signed" certificate for the marketing pack
  • Discreet on-site presence · no big trucks, no signage, no surprise tradies during opens
The YBMT deliverable

What you get from us — nothing more, nothing less.

01
Date-locked program
Listing date is your anchor · we schedule backwards from it · finish date in the contract.
02
Marketing-ready certificate
One-page "YBMT structural repair · engineer co-signed" certificate for your sales agent.
03
Buyer's solicitor pack
Full structural engineering review, scope, photographic record, QBCC HWI certificate — the full file.
04
Transferable guarantee
25-year structural guarantee transfers to the next owner · a powerful selling point.
05
Discreet build
Plain vehicles, no signage on your lawn, before-opens schedule · we know it's your home until it sells.
06
Listing-photo-ready finish
Site cleared, paintwork blended, sub-floor reinstated · ready for the photographer.
Your timeline
From call to scoped quote: 48 hours. From contract to start: 7-14 days. From start to listing-ready: 4-6 weeks for typical sub-floor / framing repair package.
48-Hour Scoped Quote · Guaranteed · YBMT Termite Damage Repair · QBCC 1234567
Pre-Sale Termite Repair · Vendor's Timeline Calculator

Work backwards from your listing date · know exactly when to start.

We never sell your data. We never quote without a site walk. We don't use voicemail.
48-Hour Scoped Quote · Guaranteed · YBMT Termite Damage Repair · QBCC 1234567
Ready to start

Book the 90-minute structural site walk.

Scoped quote in your inbox within 48 hours · structural-engineer co-signed
Book the site walk →